Relamping for Parkhotel Holzner
Herausforderung
Intervention of relamping with reduction and replacement of 253 light bodies with low consumption LED technology and the possibility of adjusting the light intensity through an intelligent management system.
Lösung
The intervention made it possible to significantly reduce electricity consumption for lighting, which before the intervention amounted to 54,820 kWh / year. Thanks to the technological upgrade and the introduction of a control and management system, the Hotel Holzner was able to save energy and corresponding CO2 emissions up to 85%.
Standort
Soprabolzano (BZ)
Parkhotel Holzner
Relamping