Stadion an der Alten Försterei, 1. FC Union Berlin

Challenge

New construction of an energy centre with a combined heat and power unit, three condensing boilers and other technical equipment.

Solution

New construction of an energy centre with CHP unit, three condensing boiler systems and central flue gas system, I&C and electrical systems, local heating line to supply the main stand, football pitches and sanitary facilities, including civil engineering, transformer and electricity distribution systems, natural gas supply system, electricity and heat supply, comprehensive operational management.

Location

An d. Wuhlheide 263
12555 Berlin
Client

1. FC Union Berlin

Type of building

Stadion an der Alten Försterei

Realisation

Key Facts

  • CHP: 50 kWel, 100 kWth
  • 3 condensing boilers: 3,600 kW
  • CO2 savings: approx. 600 t/year
  • Energy data management system: Control of the CHP and the operation of the boilers, pumps and other actuators, as well as the lawn heating systems