Renovation of the main stand of the Merck Stadium

Challenge

EAB Elektroanlagenbau is the executing company for electrical work in the Merck Stadium in Darmstadt 98 and a business partner, maintaining good relations with the club. EAB was commissioned to carry out the electrical installation for SV Darmstadt 98 Stadion GmbH for the new construction of the main stand, on the site of the "old" main stand, as part of the Merck Stadium at Böllenfalltor. The new construction of the main stand includes the roofing and a 4-story functional building plus a basement with areas for sports, press, recreation rooms for spectators (boxes and business club), security authorities and stadium operators for the Merck Stadium at Böllenfalltor. The building is used for home match days of SV Darmstadt and for events organized by the stadium operator. SV Darmstadt 98 has been playing its home matches at the Böllenfalltorstadion since 1921.

Solution

EAB carried out many necessary services such as the fire alarm system, safety lighting, low-voltage installation systems, and building skin distributions AV / SV. A spot in the VIP-area allowed the company to present itself as a company with its services in the stadium. This allows spectators in the VIP-area to see how everything was created. In addition, EAB ran perimeter advertising at selected matches, which was also shown on sports programmes, and thus achieved a very wide reach. The target audience includes potential customers who will become aware of EAB, as the VIP area is an excellent platform for networking. Additionally, the name EAB / Elevion Group gains brand recognition as the broadcast was also shown on TV. Lastly, the company was commissioned to provide subdistributions such as:

  • SHEV systems
  • Lighting systems
  • KNX lighting controls
  • IT cabling incl. racks, data socket, etc.
  • Intercom system
  • Antenna system
  • Intruder alarm system
  • Fire protection
  • Planned services
  • Installed masses
Client

SV Darmstadt 98

Type of building

Merck Stadion

Realisation
04

Key Facts

  • 170,000m of cables and lines
  • 120,000m of data cable and low-current lines, fiber optics
  • 2,000 switches and sockets
  • 500 data outlets
  • 30 electrical distribution boards + GHV
  • 2,500m cable routes
  • 18,000m installation pipes