ARENA – World of Sports
Challenge
The sporting goods manufacturer adidas has built a new corporate headquarters with the construction of a turnkey office and reception building. The building is to provide space for around 2,000 employees. HERMOS provides the corresponding room automation on the four full floors by integration via BACnet and Profinet in FIS. Heating, air conditioning and ventilation systems of the headquarters as well as the exterior and interior lighting will be integrated.
Solution
- User-oriented room automation of lighting, shading and temperature
- Energy savings through optimization of individual control tasks and monitoring of operating states
- Energy-efficient control and regulation of heating, cooling and ventilation systems
- Monitoring and visualization of building services
Use of BIM 5D® in planning and execution. Expansion of the three upper floors in parallel through the use of LEAN.Construction.
Location
Adi-Dassler-Straße 191074 Herzogenaurach
adidas
ARENA – World of Sports
Key Facts
Bus systems: Dali, M-Bus, SMI EnOcean
Manufacturer PLC and number: wago – approx. 300
Physical data points: 14000
Virtual data points: 15000